Project overview

Work in progress. The cover image is a design visualization of the finished facade. The photos below follow the job from strip-out and new plumbing to the first finished bathrooms; more will be added at handover.

Full renovation of a three-storey residential building in Jeddah, covering complete plumbing and electrical works, leak repairs, new tiling, bathroom rebuilds and facade refinishing.

Challenge

The building had aged badly: stained and weathered facades, rising damp at the base of the walls, worn terrazzo floors, and outdated bathrooms with failing tiles and old plumbing.

Scope of work

  • Complete plumbing works with new supply and drainage lines

  • Leak detection and repair, stopping water damage at the source

  • Full electrical works

  • New wall and floor tiling

  • Bathrooms rebuilt from the blockwork up

  • Facade repair and refinishing

  • Roof waterproofing

Our approach

We started by removing old finishes down to the base structure, so every problem could be fixed at the source rather than covered up. The old plumbing was replaced with new supply and drainage lines and the leaks were stopped, and the electrical system was redone before any new tiles or finishes went in.

Building Renovation – Al Safa, Jeddah

Facade design visualization for the residential building renovation in Jeddah

CLIENT

Private Client

LOCATION

Al Safa, Jeddah

SERVICE

RENOVATION & FINISHING

DATE

Project overview

Work in progress. The cover image is a design visualization of the finished facade. The photos below follow the job from strip-out and new plumbing to the first finished bathrooms; more will be added at handover.

Full renovation of a three-storey residential building in Jeddah, covering complete plumbing and electrical works, leak repairs, new tiling, bathroom rebuilds and facade refinishing.

Challenge

The building had aged badly: stained and weathered facades, rising damp at the base of the walls, worn terrazzo floors, and outdated bathrooms with failing tiles and old plumbing.

Scope of work

  • Complete plumbing works with new supply and drainage lines

  • Leak detection and repair, stopping water damage at the source

  • Full electrical works

  • New wall and floor tiling

  • Bathrooms rebuilt from the blockwork up

  • Facade repair and refinishing

  • Roof waterproofing

Our approach

We started by removing old finishes down to the base structure, so every problem could be fixed at the source rather than covered up. The old plumbing was replaced with new supply and drainage lines and the leaks were stopped, and the electrical system was redone before any new tiles or finishes went in.